Environment and Resource Management

Georgina and Diamantina resource operations plan

The Georgina and Diamantina resource operations plan (ROP) has been provided split in sections to enable faster download and as a complete PDF to facilitate printing.

Georgina and Diamantina ROP, in sections

ROP, section 1 (PDF, 294K)*  contains:
Resource operations plan 
ROP, section 2 (PDF, 563K)*  contains:
Attachment 1: Georgina and Diamantina plan area 
ROP, section 3 (PDF, 381K)*  contains:
Attachment 2A: Upper Georgina water management area 
ROP, section 4 (PDF, 494K)*  contains:
Attachment 2B: Lower Georgina water management area
ROP, section 5 (PDF, 398K)*  contains:
Attachment 2C: Burke and Hamilton water management area
ROP, section 6 (PDF, 523K)*  contains:
Attachment 2D: Upper Diamantina water management area
ROP, section 7 (PDF, 547K)*  contains:
Attachment 2E: Lower Diamantina water management area
ROP, section 8 (PDF, 153K)*  contains:
Attachment 3: Links between this plan and the Water Resource (Georgina and Diamantina) Plan 2004
Attachment 4: Pump sizes and maximum rates
Attachment 5: Significant waterholes and wetlands

Complete Georgina and Diamantina ROP

Contact details

If you have problems downloading any of these documents, or would like a copy sent by post, please contact:

Longreach Office
PO Box 210
LONGREACH QLD 4730

Phone: (07) 4658 4900
Fax: (07) 4658 3525
Email: Georgina and Diamantina WRP coordinator

* Requires Acrobat Reader

Last updated: 09 December 2008

Catchments

Topics in this site