Condamine and Balonne resource operations plan
The Condamine and Balonne resource operations plan (ROP) has been provided in split sections to enable faster download and as a complete PDF to facilitate printing.
Condamine and Balonne ROP in split sections
Section 1 (PDF, 676K)* contains:
- Foreword
- Contents
- Chapter 1 - Preliminary
- Chapter 2 - Dealing with water licences
- Chapter 3 - Granting, amending and converting authorisations
Section 2 (PDF, 283K)* contains:
- Chapter 4 - Upper Condamine water management area
- Chapter 5 - Condamine and Balonne water management area
- Chapter 6 - Lower Balonne water management area
- Chapter 7 - Condamine and Balonne tributaries water management area
Section 3 (PDF, 418K)* contains:
- Chapter 8 - Upper Condamine water supply scheme
- Chapter 9 - Chinchilla weir water supply scheme
- Chapter 10 - Maranoa River water supply scheme
- Chapter 11 - St George water supply scheme
Section 4 (PDF, 319K)* contains:
- Chapter 12 - Flow event management rules for the Lower Balonne water management area
- Chapter 13 - Performance assessment
- Chapter 14 - Resource operations licence holder monitoring and reporting
- Chapter 14(A) - Distribution operations licence holder monitoring and reporting
Section 5 (PDF, 269K)* contains:
- Chapter 15 - Amendments to the resource operations plan
- Chapter 16 - Resource operations management guidelines
- Attachment 1 - Dictionary
Section 6 (PDF, 648K)* contains:
- Attachment 2 - Plan Area
- Attachment 3 - Water supply schemes (supplemented water)
Section 7 (PDF, 280K)* contains:
- Attachment 4 - Details associated with water supply schemes in the Condamine Balonne plan area
Section 8 (PDF, 2.2M)* contains:
- Attachment 5 - Water management area zones
Section 9 (PDF, 3.1M)* contains:
- Attachment 5 - Water management area zones
Section 10 (PDF, 1.8M)* contains:
- Attachment 5 - Water management area zones
Section 11 (PDF, 1.7M)* contains:
- Attachment 6 - Water supply scheme zones
Section 12 (PDF, 889K)* contains:
- Attachment 6 - Water supply scheme zones
- Attachment 7 - Outcomes of water resource (Condamine Balonne) plan 2004
- Attachment 8 - Water allocations converted under section 45
- Attachment 9 - Water allocationed amended under section 47
- Attachment 10 - Interim water allocation not converted to a water allocation
- Attachment 11 - Pump sizes and maximum rates
- Attachment 12 - Scheme details for the distribution operations licence for the Thuraggi Watercourse
- Attachment 13 - Amendment history
Complete Condamine and Balonne ROP
- Condamine and Balonne ROP (PDF, 10M)*
Contact details
If you have problems downloading any of these documents, or would like a copy sent by post, please contact:
Toowoomba Office
203 Tor St
PO Box 318
TOOWOOMBA QLD 4350
Phone: (07) 4529 1200
Fax: (07) 4529 1555
Email: Condamine WRP coordinator
* Requires Adobe Reader
Last updated 12 December 2011
