Calliope River catchment
- Current status of planning activities
- Water resource plan
- Resource operations plan
- Map of Calliope River catchment
- Contact details
Current status of planning activities
| Water resource plan (WRP) | ||
|---|---|---|
| Intention to prepare draft WRP announced | Draft WRP released | Final WRP approved |
| 04-03-04 | 05-08-06 | 15-12-06 |
| Resource operations plan (ROP) | ||
|---|---|---|
| Intention to prepare draft ROP announced | Draft ROP released | Final ROP approved |
| 05-08-06 | 29-05-07 | 02-05-08 |
Water resource plan
The minister released the Water Resource (Calliope River Basin) Plan 2006 in December 2006. Explanatory notes (PDF)* accompany the plan.
A consultation report (PDF, 286K)* summarises the issues raised by the public and how they have been dealt with in finalising the Calliope River Basin water resource plan.
Resource operations plan
The then Minister for Natural Resources and Water released the Calliope River Basin resource operations plan (PDF, 334K)* in May 2008, following a period of consultation and review that began with the release of a draft plan in May 2007.
Map of Calliope River catchment
You can also download a detailed Calliope River catchment water planning area map (PDF, 138K)* .
Contact details
If you have problems downloading any of these documents, or would like a copy sent by post, please contact:
Rockhampton Office
Rockhampton State Gov Bld
Level 2 209 Bolsover St
PO Box 1762
ROCKHAMPTON QLD 4700
Toll-Free: 1800 822 100
Fax: (07) 4938 4011
Email: Calliope WRP coordinator
* Requires Adobe Reader
Last reviewed 24 October 2011
Last updated 4 February 2010
