Current status of planning activities

Water resource plan (WRP)
Intention to prepare a draft WRP amendment Draft WRP amendment released Final WRP amendment approved
N/A 06-06-08
Intention to prepare draft WRP announced Draft WRP released Final WRP approved
N/A 20-12-01 19-12-02
Resource operations plan (ROP)
Intention to prepare draft ROP announced Draft ROP released Final ROP approved
29-01-03 02-08-04 16-06-05 

Draft water resource plan amendment

The Barron draft Water Rresource Plan amendment (PDF, 602K)* reviews the provisions for managing unsupplemented and subartesian water in the Upper Barron catchment area. This area encompasses the area above Lake Tinaroo and the Rocky, Spring and Cherry creek catchments.

Resource operations plan

The Barron Resource Operations Plan was finalised in June 2005 after a consultation and review process that began when the draft plan was released.

A key benefit of the plan is that it allows water trading among water users.

Water resource plan

The Barron Water Resource Plan was released in December 2002 following a submissions and evaluation process that began in 1996.

The plan aims to ensure water resources are sustainably managed to provide for present and future needs while protecting social, economic and environmental interests.

Annual report

An annual report for Queensland's water resource plans, includes the Barron catchment.

Public notice

Map of Barron catchment

You can download a detailed Barron water planning area map (PDF, 169K)* .

Contact details

If you have problems downloading any of these documents, or would like a copy sent by post, please contact:

Mareeba Office
28 Peters Street
MAREEBA QLD 4880

Phone: (07) 4048 4874
Fax: (07) 4092 2366
Email: Barron WRP coordinator

* Requires Acrobat Reader

Last updated: 13 October 2009

Catchments

Topics in this site