Environment and Resource Management

Current location of water allocations in the Upper Burnett Water Supply Scheme

A change to the location of a water allocation is possible between zones.

If the change can be made within the maximum and minimum constraints set by the trading rules , then the change will be approved.

If an application to change the location of a water allocation would cause the maximum and minimum constraints to be exceeded, then individual assessments and public advertisements are required.

Under review

HIGH priority water allocations (ML)
UPPER BURNETT WATER SUPPLY SCHEME Nominal Volumes as at COB 22nd November 2009
Location Minimum Volume (ML) Current Volume (ML) Maximum Volume (ML) Projected Volume (ML) *
Burnett/Auburn Zone MA 0 0 0 0
Burnett Zone GB 0 0 0 0
Burnett Zone GY 0 0 180 0
Burnett Zone GZ 0 0 0 0
Burnett Zone MA 0 0 0 0
Burnett Zone NA 820 1,000 1,000 1,000
Burnett Zone NB 0 0 0 0
Burnett Zone NC 0 0 0 0
Burnett Zone OA 320 320 320 320
Burnett Zone OB 0 0 0 0
Burnett Zone OC 200 200 350 400
Burnett Zone OD 0 0 0 0
Burnett Zone PA 0 0 0 0
Nogo Zone SA 0 0 0 0
Burnett/Nogo Zone SB 10 10 10 10
All values in Megalitres

* This represents the forecasted 'current volume' assuming all outstanding dealing certificates or matters under review are registered on the water allocations register

MEDIUM priority water allocations (ML)
UPPER BURNETT WATER SUPPLY SCHEME Nominal Volumes as at COB 22nd November 2009
Location Minimum Volume (ML) Current Volume (ML) Maximum Volume (ML) Projected Volume (ML) *
Burnett Zone OB 6,405 6,933 11,338 11,005 6,933
Burnett Zone OC 0 1,328 4,283 1,478
Burnett Zone SA 0 1,000 4,000 1,000
Burnett/Nogo Zone SB 0 1,050 4,050 1,050
Burnett Zone NC 2,411 7,955 20,507 12,861 7,955
Burnett/Auburn Zone MA 883 1,326 10,593 1,326
Burnett Zone OA 5,863 11,424 16,253 11,424
Burnett Zone OD 0 390 1,560 1,560 390
Burnett Zone PA 0 1,170 1,560 1,170
Burnett Zone GY 960 2,850 14,444 7,410 2,850
Burnett Zone GB 913 2,536 7,363 2,536
Burnett Zone NA 1,951 3,705 8,601 3,705
Burnett Zone NB 3,488 5,353 10,138 5,353
All values in Megalitres

* This represents the forecasted 'current volume' assuming all outstanding dealing certificates or matters under review are registered on the water allocations register

A combined maximum or minimum volume for two or more zones means the total current volume for all those zones, when added together, must not breach that maximum or minimum figure. For example, if two zones have a combined maximum volume of 1,000ML then the current volume of both zones must always be at or below 1,000ML.

Some zones will also have individually specified maximum or minimum volumes as well as a combined maximum or minimum volume. For example, if Zone 1 and Zone 2 specify a maximum volume of 800ML and 950ML respectively, then the current volume for each zone must not exceed the volume specified for the zone value. If both these zones also have a combined maximum volume of 1,500ML then the current volume of both zones combined must not exceed 1,500ML.

Last updated: 11 July 2008