Surat to Gladstone Pipeline Project
The proponent for the Surat to Gladstone Pipeline proposal is Surat Gladstone Pipeline Pty Ltd (SGP) a wholly owned subsidiary of Arrow Energy Ltd. Arrow Energy Ltd currently holds 90 000km2 of coal seam gas exploration tenements in the Surat Basin. The pipeline is proposed to deliver coal seam gas (CSG) from adjacent to the Kogan North Central Gas Processing Facility near Dalby to a proposed Liquefied Natural Gas (LNG) facility at Fisherman’s Landing near Gladstone (the LNG facility is subject to a separate assessment process under the Environmental Protection Act 1994). SGP currently holds a petroleum and gas Survey Licence No. 36 which covers the proposed project area.
The 660mm diameter high pressure buried steel gas pipeline would be approximately 470km long. The pipeline would have a minimum technical design life of 40 years. Above ground facilities would be required at intervals along the pipeline, including: mainline valves; cathodic protection systems; and marker signs.
The Environmental Impact Statement for the Surat to Gladstone Pipeline project is currently available for review. Any interested persons are invited to view the document and provide a submission on the adequacy of the EIS in identifying, describing and mitigating any environmental impacts. The EIS is available for viewing at the locations described on the Public Notice (s.51 & s.52 EP Act). It is also available at the following web site: www.arrowenergy.com.au/sgp. A hard copy or CD can be obtained by contacting Rubina Smith of SGP on (07) 3012 4418 or write to: Surat Gladstone Pipeline Pty Ltd, PO Box 5262, BRISBANE, QLD, 4001.
Submissions should be received by Monday 14 September 2009 and should be addressed to:
The Chief Executive, Department of Environment and Resource Management
Attn: EIS Coordinator, Surat to Gladstone Pipeline Project
PO Box 15155
CITY EAST QLD 4002
The process for the assessment of the Surat to Gladstone Pipeline Project is as follows:

Copies of publicly available documents can be obtained by accessing the links below:
- Final terms of reference
- Initial advice statement describing the project
- Appendix 5 - Surat Gladstone Pipeline
- Appendix 6 - Surat Gladstone Pipeline
- Public notice (s46 EP Act)
- Public notice (s51 & s52 EP Act)
For further information about the EIS process for the Surat to Gladstone Pipeline Project please contact the EIS Co-ordinator on telephone 1300 130 372. Additional information about the project is also available by contacting SGP on (07) 3012 4418.